| Keywords = | ||
| Number of Proceedings: 6 | ||
| 1 | OPTIMIZATION OF PROJECT TIME-COST TRADE-OFF WITH CONTROLLED CASH FLOWS | |
| Mohamed Abo-Zaid, Tamer El-Korany, Emad E. Etman, Salah El-Din F. Taher | ||
| Show Article | ||
| 2 | Finance Based Scheduling Optimization Model for Construction Projects Portfolio Using Enhanced Genetic Algorithm | |
| Hesham A. Abdel-khalek, Sherif M. Hafez, Hamada A. Kassem | ||
| Show Article | ||
| 3 | Optimizing Cash Flow of Construction Projects through Material Procurement Plans | |
| Mahmoud AbuElnasr, Emad Etman, Haytham Sanad, Mahmoud AbuElnasr, Emad Etman, Haytham Sanad | ||
| Show Article | ||
| 4 | Optimum Cost Design of Reinforced Concrete Beams Using Artificial Bee Colony Algorithm | |
| F. A. Abdelmgeed, M. Ghallah, A. Hamoda | ||
| Show Article | ||
| 5 | Productivity and Safety Based Model for Construction Site Layout Optimization | |
| Haytham M. Sanad, Mohammad A. Ammar | ||
| Show Article | ||
| 6 | OPTIMIZATION OF HIGH-PERFORMANCE STEEL-CONCRETE COMPOSITE BEAMS CONSIDERING CARBON EMISSIONS | |
| Yunyi Deng, Kang Chen, Linzheng Huang, Bo Yang* | ||
| Show Article | ||