Keywords =
Number of Proceedings: 6

1 OPTIMIZATION OF PROJECT TIME-COST TRADE-OFF WITH CONTROLLED CASH FLOWS
Mohamed Abo-Zaid, Tamer El-Korany, Emad E. Etman, Salah El-Din F. Taher
Show Article

2 Finance Based Scheduling Optimization Model for Construction Projects Portfolio Using Enhanced Genetic Algorithm
Hesham A. Abdel-khalek, Sherif M. Hafez, Hamada A. Kassem
Show Article

3 Optimizing Cash Flow of Construction Projects through Material Procurement Plans
Mahmoud AbuElnasr, Emad Etman, Haytham Sanad, Mahmoud AbuElnasr, Emad Etman, Haytham Sanad
Show Article

4 Optimum Cost Design of Reinforced Concrete Beams Using Artificial Bee Colony Algorithm
F. A. Abdelmgeed, M. Ghallah, A. Hamoda
Show Article

5 Productivity and Safety Based Model for Construction Site Layout Optimization
Haytham M. Sanad, Mohammad A. Ammar
Show Article

6 OPTIMIZATION OF HIGH-PERFORMANCE STEEL-CONCRETE COMPOSITE BEAMS CONSIDERING CARBON EMISSIONS
Yunyi Deng, Kang Chen, Linzheng Huang, Bo Yang*
Show Article